The Equity
Scope of work: Plumb a 2-bay load out building
Included:
- Installation of (13) HDPE underground lines 4”, 6”, & 8”
- Installation of (2) 12’ diameter water tanks
- Installation of (2) 3” truck load in lines
- Installation of (2) 4” SS manifolds inside building
- Installation of (2) top and bottom load outs
- Fabricated and installed a 6’ x 18’ platform w/stairs
- Installed (2) 7-step safety stairs w/hoop
- Fabricated (3) SS sumps w/grates for the building
- Installation on 2” SS piping for (20) SS chemical tanks
- Fabrication and installation of 152’ of pipe chase
- Fabrication and installation of 120” of catwalk + (1) stairway
- Installation of (30) Hot load ports
- Installation of SS piping to a weigh unit
- Piping in outside dike for (3) tanks
- Installed (2) 3,000-gallon poly tanks (1 for corn/1 for beans)