Seven steel pipelines running adjacent to the Pan-American Highway were to be relocated due to a highway expansion. This included breaking 3,600 feet of terrain to lay pipelines, temporarily divert a river flow and build two control valve rooms. Attaching the new pipelines to their existing system was performed by hot-tapping method because the facility cannot stop daily operations.